Instructions for use
Use available plaster units with a single mixing chamber to apply the plaster onto the entire area to be treated during one working cycle. After application, carefully remove excess plaster with H-type darby, patch holes if any, and trowel the entire surface with a darby. Leave surface treated that way for around 4-12 hours (depending on substrate absorption and weather conditions) until initial plaster setting takes place. The plaster should be set enough so that fresh plaster is not scraped but abraded with another pass of the darby. Smooth the entire area with a trapezoid floating rule again, spray the plaster with water and trowel with a Styrofoam float or, if hard enough, with a rough plastering sponge. To achieve fine structure, finish the plaster with the use of dry float with fine and soft sponge or felt. Use a power trowel to get an ideally smooth and even finish.
Alpol Proffesional Building Materials is a nationwide distributor that specialises in the selling and distribution of Rendering , plastering and building materials. High quality with great results, 100% 5 star reviews. Bringing suppliers and manufacturers together as a community, with advice and support.
Navigation
Menu
Useful Links
Menu
Contact
Alpol West Midland
+44 1384 671711
Leeds
+01133455170
Alpol West Midland
Ā +44 1384 671711
Leeds
Ā +01133455170